Name: Emery Pipeline
Contract Amount: $2,358,035.75
Owner: Gila Valley Irrigation District (GVID)
General Contractor: REDPOINT Contracting
Year: 2013
On this project Redpoint performed as a general contractor for the Gila Valley Irrigation district. The project purpose was to tie in a newly developed well field into the Irrigation system. The work consisted of 11,980 LF of 8"-36" HDPE fusion watermain and a 220 LF 42" diameter HDPE Fusion Water Main, jack&bore, precast concrete structures