Name:
Iron Mountain Data Center
Contract Amount:
$$1,353,238.00
Owner:
Iron Mountain Data Center
General Contractor:
Holder Construction Group, LLC
Year:
2019
Construction of a 175,651 SF Data Center and related site improvements. The project-specific scope included underground utilities as noted below:
SEWER LINE:
• 6” PVC - 252 LF
• 6” sewer cleanouts - 2 EA
STORM LINE:
• 8” HDPE - 22 LF
• 12” HDPE - 359 LF
• 18” HDPE - 627 LF
• 24” HDPE - 117 LF
• 30” HDPE - 334 LF
• 36” HDPE - 667 LF
• 48” HDPE - 36 LF
• 12” CMP - 73 LF
• 120” CMP Detention System - 693 LF
FIRE LINE:
• 6” DIP - 442 LF
• 8” DIP - 1,742 LF
• 12”x 8” tapping sleeve - 2 EA
DOMESTIC WATER LINE:
• 4” C900 - 65 LF
• 1.5” PVC - 6 LF