Logo
  • Contact Us
  • About Us
    • General Overview
    • Differentiators
    • Quality
    • Equipment
    • Sustainability Policy
  • Services
    • Earthwork
    • Wet Utilities
    • Storm Structures
    • Storm Retention
    • Pump Station and Structures
    • Sewer Treatment
    • Sewer Rehab and Lining
    • Erosion & Flood Control
    • Pipe Fusion
    • By-Pass
    • Mechanical Special Scope
    • Buildings and Walls
    • Trenchless Technology
    • Rock Excavation
    • Paving
    • Dry Utilities
  • Safety
    • EMOD
    • Redpoint Safety
    • Safety Training
  • Careers
    • Join the Team
    • Subcontractors
    • Employee Resources
  • Projects
    • Earthwork
    • Wet Utilities
    • Storm Structures
    • Storm Retention
    • Pump Station and Structures
    • Sewer Treatment
    • Sewer Rehab and Lining
    • Erosion & Flood Control
    • Pipe Fusion
    • By-Pass
    • Mechanical Special Scope
    • Buildings and Walls
    • Trenchless Technology
    • Rock Excavation
    • Paving
    • Dry Utilities
< Go back to search
Recent search
  • > AC Patch
  • Nau Hilltop
  • Meadowbrook Drive Watermain Replacement
  • Intel Deep Sewer Cs0301
  • Dema Florence Readiness Center
  • Ken Mcdonald Golf Course Recharge Well
  • Lookout Mountain School
  • Intel Ocotillo Temp Sewer Bypass Ro Facility Pipeline Reroute
  • Pir Waterline
  • GRIC District 3 Cholla Rd
  • Academic Training Center At Luke AFB
  • Papago Readiness Center
  • Newland Site 13 Offsite Waterline
  • Marina Heights
  • Frys Sundome Crossing
  • District 3 Water Storage Tank And Waterline Project
  • USAA Norterra
  • Great Hearts Academy
  • Alta Tempe
  • College Ave Streetscape
  • Crescent Apartments
  • Bell Rd Manhole Rehab
  • Wells Fargo Chandler Campus Expansion
  • Camden Chandler Apartments
  • Switzer Canyon Transmission Main Phase Ii
  • Tempe Business Park
  • Gillette Regional Water Extensions Phase 1
  • Roosevelt Street Box Culvert
  • Paradise Village Rehabilitation Project
  • Wastewater Collection System Manhole Rehab Phase Iii
  • 2015 Superior Louisville Potable Water Interconnect
  • Skunk Creek Landfill Drainage Improvements Repair
  • Commons At The Square Apartments
  • LA Fitness Oro Valley
  • Peoria Sports Complex
  • D3 Waterline Relocation
< Back to search
Name: Marina Heights
Contract Amount: $1,833,484.00
Owner: SFSR Marina Heights, LLC
General Contractor: RYAN COMPANIES US, INC.
Year: 0
This project contains 1,900 LF of Domestic Water Service, 5 Meter Connections, 1,600 LF of DIP Fire Line, 1580 LF of Epoxy Lined DIP sewer Service, Deep Connection involving heavily engineered shoring Systems.
  • CONTACT
  • |
  • JOIN US
  • |
  • SUBCONTRACTORS
  • LinkedIn
  • Facebook