Contract Amount: $253,425.00
Owner: Gila River Indian Community
General Contractor: REDPOINT Contracting
Year: 2015
Project consisted of rehabilitation of the water distribution system on South Loop Road in the Wild Horse Pass (WHP) area. This rehabilitation included the removal and replacement of existing pavement, curb & gutter, fittings, 841 LF of waterline and fire hydrants.