Contract Amount: $870,956.00
Owner: NTT GLOBAL DATA CENTERS AMERICAS
General Contractor: Clayco
Year: 2022
This project consists of onsite grading and drainage, onsite paving, private water improvements, and private sewer improvements. SEWER LINE: • 4” PVC – 255 LF • 8” PVC – 1,183 LF • SS manhole 4’ – 6 EA STORM LINE: • 8” HDPE – 45 LF • 18” HDPE – 564 LF • MAG 501 Headwall 18” – 3 EA • Handrail for Headwall 18” – 3 EA • Nyoplast drain basin 18” – 9 EA FIRE LINE: • 6” DIP – 142 LF • 8” DIP – 2,025 LF DOMESTIC WATER LINE: • 1” PVC – 5 LF • 3” PVC – 122 LF • 3” Vertical realign – 1 EA • 1” Meter connection – 1 EA • 2” Meter connection – 1 EA • 1” RPBP – 1 EA • 3” RPBP – 1 EA