Our company recognizes the increasing need to find creative ways to offset rising costs in labor, material and energy and work to achieve those goals through waste reduction. In today’s highly competitive marketplace, efficient performance is the key to success.
The following practices are implemented to ensure that duplication, material waste, and miscommunication are replaced by efficiency and responsiveness within all projects:
- REDPOINT makes use of today’s latest, cloud-based, fully paperless technology to run at maximum efficiency. Some of the systems we employ include: Hard Dollar, Textura, Planswift, Gradebeam, Fleetmatics GPS and CMIC for project controls.
- Access to real time photo captures keeps the managers and executives updated of field activities.
- 48-hour project buyout process, mandating a project be bought out within 48 hours, streamlining every step of the project life cycle.
- REDPOINT only works with trusted and qualified vendors and subcontractors.
- 100% cloud-based streamlined submittals process.
- Every project is required to have a comprehensive job start checklist completed prior to the LEAN Last Planner conference.
- No field resources are committed to a project until the last planner session is complete.