Costco Wholesale Warehouse

Contract Amount: $3,886,175.00

Owner: Costco Wholesale

General Contractor: Jackson Dean Construction

Year: 2022

Developed Site – 18.17 acres, Ground-Up Warehouse & Canopy (160,434 sq ft) – including: Erosion Control, Demolition , Site Clearing, Earthwork . Earthen berms – 3,865 LF Scarify and compact – 66,664 SY Clear & grub – 23 Acre Excavation to fill – 9,982 CY Embankment – 35,713 CY Pad over-excavation – 60,124 CY Roadway abc placement – high production – 16,176 TN Finegrade pad – 17,787 SY Grading – roadway – 48,529 SY Grading – concrete flatwork – 3,683 SY Grading – parkway/landscaping – 37,200 SY Prep and backfill – curb – 12,606 LF Backfill – sidewalk – 31,671 SF 4” AC paving – heavy duty – 19,797 SY 3” AC paving – light duty – 28,732 SY Sanitary sewage SYstem 6” pvc – 696 LF 8” pvc – 1,409 LF SS manhole 5’ – 12 EA Site drainage 6” hdpe – 160 LF Storm underdrains – 18 EA 6” hdpe underdrain – 960 LF 8” hdpe – 385 LF 12” hdpe – 4,5z6 LF 15” hdpe – 681 LF 18” hdpe – 473 LF 24” hdpe – 623 LF Box catch basin – 19 EA Sd manhole 4’ – 14 EA Fire protection water supply, hydrants 4” DIP – 76 LF 6” dip – 346 LF 8” dip – 1,853 LF Fire hydrants – 6 EA Domestic water supply 2” Hard Copper – 6 LF 3” Hard Copper – 1,083 LF Concrete Asphalt paving & surfacing Pavement markings