Name: Paradise Village Rehabilitation Project
Contract Amount: $3,143,395.00
Owner: City of Cortez
General Contractor: REDPOINT Contracting
Year: 2015
This project for the City of Cortez consists of the installation of approximately 6,120 LF of 8-inch sewerline; 600 F of 10-inch stormwater pipe; 60 LF of 8-inch waterline; 5,100 LF of 6-inch waterline; and all the associated smaller service line connections, fittings, valves, fire hydrant assemblies, inlets, and manholes. The project also includes the installation of 4,800 LF of fiber-optic conduit, 23 pull-boxes, and all associated items. All the streets in the projects will be reconstructed with 3-inch hot-mix asphalt, and all the adjacent curb, gutter, and sidewalk will be rebuilt once all work is complete.