Logo
  • Contact Us
  • Company
    • General Overview
    • Differentiators
    • Quality
    • Equipment
    • Sustainability Policy
  • Services
    • Earthwork
    • Wet Utilities
    • Storm Structures
    • Storm Retention
    • Pump Station and Structures
    • Sewer Treatment
    • Sewer Rehab and Lining
    • Erosion & Flood Control
    • Pipe Fusion
    • By-Pass
    • Mechanical Special Scope
    • Buildings and Walls
    • Trenchless Technology
    • Rock Excavation
    • Paving
    • Dry Utilities
  • Safety
    • EMOD
    • Redpoint Safety
    • Safety Training
  • Work with us
    • Join the Team
    • Subcontractors
  • Projects
    • Earthwork
    • Wet Utilities
    • Storm Structures
    • Storm Retention
    • Pump Station and Structures
    • Sewer Treatment
    • Sewer Rehab and Lining
    • Erosion & Flood Control
    • Pipe Fusion
    • By-Pass
    • Mechanical Special Scope
    • Buildings and Walls
    • Trenchless Technology
    • Rock Excavation
    • Paving
    • Dry Utilities
< Go back to search
Recent search
  • > AC Full Pave
  • Mesa 6Th Drive Infrastructure Improvements
  • Intel Skanska Trimix
  • Cs07A01 Reclaimed Water
  • Project Sunshine
  • White Tank Mountain Regional Rv Dump Station
  • Alta Scottsdale
  • Rancho Bella Vista Flood Mitigation
  • Switzer Canyon Transmission Main Phase Ii
  • Paradise Village Rehabilitation Project
  • Asu Sun Devil Stadium Renovation Phase Ii Iii
  • Wastewater Collection System Manhole Rehab Phase Iii
  • Lafayette Louisville Boundary Area Drainage Improvements P2
  • SR 85 Landfill Cell 1 Phases 1 and 2 Closure Drainage Improvements
  • D3 Waterline Relocation
< Back to search
Name: Intel Skanska Trimix
Contract Amount: $256,192.00
Owner: Intel Corporation
General Contractor: Skanska USA Building
Year: 0
New utilities for Trimix plant inside a working Intel facility while maintaining ongoing operations