Contact Us
Company
General Overview
Differentiators
Quality
Equipment
Sustainability Policy
Services
Earthwork
Wet Utilities
Storm Structures
Storm Retention
Pump Station and Structures
Sewer Treatment
Sewer Rehab and Lining
Erosion & Flood Control
Pipe Fusion
By-Pass
Mechanical Special Scope
Buildings and Walls
Trenchless Technology
Rock Excavation
Paving
Dry Utilities
Safety
EMOD
Redpoint Safety
Safety Training
Work with us
Join the Team
Subcontractors
Projects
Earthwork
Wet Utilities
Storm Structures
Storm Retention
Pump Station and Structures
Sewer Treatment
Sewer Rehab and Lining
Erosion & Flood Control
Pipe Fusion
By-Pass
Mechanical Special Scope
Buildings and Walls
Trenchless Technology
Rock Excavation
Paving
Dry Utilities
< Go back to search
Recent search
> AC Full Pave
Mesa 6Th Drive Infrastructure Improvements
Intel Skanska Trimix
Cs07A01 Reclaimed Water
Project Sunshine
White Tank Mountain Regional Rv Dump Station
Alta Scottsdale
Rancho Bella Vista Flood Mitigation
Switzer Canyon Transmission Main Phase Ii
Paradise Village Rehabilitation Project
Asu Sun Devil Stadium Renovation Phase Ii Iii
Wastewater Collection System Manhole Rehab Phase Iii
Lafayette Louisville Boundary Area Drainage Improvements P2
SR 85 Landfill Cell 1 Phases 1 and 2 Closure Drainage Improvements
D3 Waterline Relocation
< Back to search
Name:
Intel Skanska Trimix
Contract Amount:
$256,192.00
Owner:
Intel Corporation
General Contractor:
Skanska USA Building
Year:
0
New utilities for Trimix plant inside a working Intel facility while maintaining ongoing operations