Name: Dema Florence Readiness Center
Contract Amount: $251,658.00
Owner: State of Arizona Department of Emergency and Military Affairs
General Contractor: Haydon Building Corporation
Year: 2012
               The project included installation of 1300 LF of sewer line (8" & 4") including 5 manholes; installation of 400 LF of stormdrain, including 15 concrete headwalls; installation of 3300 LF of water main (8", 6" & 4"); a lift station with two submersible Grinder pumps 185 GPM at 92 ft excavation shading and backfilling of 1700 LF of 2" gas line.