Name: Roosevelt Street Box Culvert
Contract Amount: $1,078,804.00
Owner: City of Buckeye/Sunbelt Holdings
General Contractor: REDPOINT Contracting
Year: 2015
               This project consists of the installation of 15" VCP sewer line throughthe existing Flood Control District of Maricopa Counties (FCDMC)drainage channel. In detail, the channel will be saw cut to thenecessary width to install piping with proper shoring, a new sewer linewill be installed and the channel will be repaired.